Milford, Michigan, USA
A three-part project for the General Motors vehicle testing facility outside Detroit; the campus masterplan sited new facilities and organised roads, testing racks, security, and vehicle parking. Four major systems dictated the formal arrangements: architecture, vehicular accommodation, pedestrian connections, and programmatic relationships. The second part was a design guidelines package that established standards for building entrances, signage, and lighting. Finally the new facilities designed included a dining and reception courtyard with water feature and vehicle display area.
Smithgroup JJR project